Bridge St is in a time of massive change with the Bridge to Better works in 2026/27.
We know that at some time soon, new tenents will start moving into the empty shops, but in the meantime, we’ll keep usitlising them for temporary art projects.
Bridge St is in a time of massive change with the Bridge to Better works in 2026/27.
We know that at some time soon, new tenents will start moving into the empty shops, but in the meantime, we’ll keep usitlising them for temporary art projects.
126 Bridge St, Nelson (ex Labels Resale Clothing)
Stitch Bloom is part of the Windows on Bridge series of art installation in empty shops, most to be viewed from the footpath. We’ll be rolling out Windows on Bridge over the next…
126 Bridge St, Nelson (ex Labels Resale Clothing)
Status: active
Start Date: 28/09/2026
End Date: